संग्रहण प्रसिध्दीपत्रक आणि प्रकाशित बातम्या
| Sr. No. | Title | Start Date | End Date | Download/Details | Category |
|---|---|---|---|---|---|
| 141 | 3 tier station of metro line 9 is 65% completed | 13-03-2023 | 13-03-2024 | Download(1.09 MB) |
बातम्या |
| 142 | 1st composite steel girder span erected at Sewri side in MTHL project | 22-02-2023 | 22-02-2024 | Download(1.28 MB) |
बातम्या |
| 143 | Hon. Chief Minister Shri. Eknath Shinde Inaugurated Kopri ROB | 14-02-2023 | 14-02-2024 | Download(1.66 MB) |
बातम्या |
| 144 | Hon. Prime Minister Inaugurated MMRDA's another two important infrastructure projects just after Metro | 14-02-2023 | 14-02-2024 | Download(3.45 MB) |
बातम्या |
| 145 | Mumbai's First North-South & East-West Connectivity 66% Complete | 14-02-2023 | 14-02-2024 | Download(628.97 KB) |
बातम्या |
| 146 | Surya Regional Water Supply Scheme is on the verge of completion. | 01-02-2023 | 01-02-2024 | Download(2.12 MB) |
बातम्या |
| 147 | Tunnel (LHS) in Parsik Hills was opened from both sides using a controlled blasting method In the presence of the Hon. Chief Minister | 30-01-2023 | 30-01-2024 | Download(1007.52 KB) |
बातम्या |
| 148 | A Million plus commuters travelled within a week on Metro 2a and 7 since it was inaugurated by Hon. Prime Minister of India | 30-01-2023 | 30-01-2024 | Download(1.2 MB) |
बातम्या |
| 149 | Civil Work of Lt. Balasaheb Thackeray Rashtriya Smarak 65 % Completed | 25-01-2023 | 25-01-2024 | Download(796.7 KB) |
बातम्या |
| 150 | MUMBAI METRO LINES 2A AND 7 (PHASE 2) DEDICATED TO MUMBAIKARS BY HON. PRIME MINISTER SHRI. NARENDRA MODI | 20-01-2023 | 20-01-2024 | Download(4.59 MB) |
बातम्या |
| 151 | MMRDA received CMRS Certificate | 16-01-2023 | 16-01-2024 | Download(687.85 KB) |
बातम्या |
| 152 | Andheri (W) station consist of 3 levels | 16-01-2023 | 16-01-2024 | Download(692.52 KB) |
बातम्या |
| 153 | Longest OSD of MTHL pkg 2 Launched in the presence of Hon. Chief Minister | 12-01-2023 | 12-02-2024 | Download(1.17 MB) |
बातम्या |
| 154 | Mega block for testing of integrated signaling system on Metro Line 2A &7 | 10-01-2023 | 10-02-2024 | Download(718.86 KB) |
बातम्या |
| 155 | 10 Metro Stations Of Line 7 Awarded with Highest Ranking of Green Building Initiative. | 10-01-2023 | 10-02-2024 | Download(197.06 KB) |
बातम्या |
| 156 | Year of project completion 2023 | 02-01-2023 | 02-01-2024 | Download(2.22 MB) |
बातम्या |
| 157 | Metro Depot #MMRDA Milestone , More than 50% civil work completed | 28-12-2022 | 28-01-2023 | Download(7.42 MB) |
बातम्या |
| 158 | MMRDA started installation of 1550 mm high crash barriers on MTHL | 27-12-2022 | 27-01-2023 | Download(779.56 KB) |
बातम्या |
| 159 | 70 % Civil works were completed in Phase 1 of Metro Line 5 | 23-12-2022 | 23-12-2023 | Download(791.48 KB) |
बातम्या |
| 160 | MMRDA started installation of 1550 mm high crash barriers on MTHL | 23-12-2022 | 23-01-2023 | Download(779.56 KB) |
बातम्या |



