Metro Line - 12
- Metro Line 12 connection through Kalyan, Dombivali MIDC, Kalyan Growth Centre, Wadavli, Turbhe, Pisarve, Taloja and Amandoot.
- Dedicated Depot is planned at Nilje in up to an extent of 31 Ha.
- It shall reduce the current travel time by anything between 50% and 75% depending on road conditions.
- It shall provide rail-based access to the commercial, Govt. bodies and geographical landmarks in Mumbai & Navi Mumbai.
- Length: 23.57 Km (Fully Elevated)
- Line Color: Orange Line
- Stations: 19 Nos. (Fully Elevated)
- Depot: Nilje (31 Ha.)
- Interchanging Stations:
- Kalyan (Metro Line 5: Thane-Bhiwandi-Kalyan)
- Hedutane (Metro Line 14: Vikroli-Badlapur)
- Amandoot (Navi Mumbai Metro Line 1)
- Project Completion Cost: ₹ 5,865 Cr.
- Daily Ridership (2031): 2.62 Lakhs
Sr. No. | Name of Work | Status (%) |
---|---|---|
1 | Pile Works | 19% |
2 | Pile Cap Works | 14% |
3 | Pier Works | 7% |
4 | Pier Cap Works (Erection) | 5% |
5 | U Girder Works (Erection) | 0.5% |