inner-banner

Archive What's New/Events

Sr. No. Title Published Date Download/Details
501 Design and Construction of South bound flyover at the junction of ANDHERI-GHATKOPAR LINK Road on Eastern Express Highway (EEH), Mumbai. Corrigendum No. 01 View Detail
502 Declaration of Intention to add the rest of the area of Kalyan Growth Centre in Town Planning Scheme No. 1 (TPS No.1) Download(7.4 MB)Declaration of Intention to add the rest of the area of Kalyan Growth Centre in Town Planning Scheme No. 1 (TPS No.1)
503 Bids for carrying out the construction of PAP tenements in proposed S. R. Scheme under Clause 3.11 read with clause 3.5 & 3.19(ii) of Appendix-IV of DCR 33(10) on the land bearing CTS no. 319/B, 343, 346, 347, 352 & 354 of village Dahisar (West). Corrigen View Detail
504 Recruitment for the post of Surveyor and Court Clerk Download(199.32 KB)Recruitment for the post of Surveyor and Court Clerk
505 Techno-Economic Feasibility and Bid- Process Management for Commercial Development in Wadala Monorail Depot Area, Mumbai (Addendum 3) View Detail
506 DRAFT TENDER DOCUMENT-MS01 Mumbai Metro : Inputs/comments on draft Tender MS01Documents for Design, Manufacture, Supply, Installation, Testing and Commissioning of Train Control & Signalling and Telecommunication System for Mumbai Metro Line 2A, 2B and 7 Download(1.11 MB)DRAFT TENDER DOCUMENT-MS01 Mumbai Metro : Inputs/comments on draft Tender MS01Documents for Design, Manufacture, Supply, Installation, Testing and Commissioning of Train Control & Signalling and Telecommunication System for Mumbai Metro Line 2A, 2B and 7
507 A)NIT No. MMRDA/MMRP/CA-15A: Part Design, fabrication, supply and erection of pre-fabricated steel roof structure including entry and exit structures at 06 Stations [Andheri(East), Shankarwadi, JVLR Junction, Mahanand, Aarey & Pathanwadi] of Andheri(East) Download(46.95 KB)A)NIT No. MMRDA/MMRP/CA-15A: Part Design, fabrication, supply and erection of pre-fabricated steel roof structure including entry and exit structures at 06 Stations [Andheri(East), Shankarwadi, JVLR Junction, Mahanand, Aarey & Pathanwadi] of Andheri(East)
508 Declaration of Intention for Town Planning Scheme No. 1 (TPS No. 1) located within the Kalyan Growth Centre (KGC) Download(1.86 MB)Declaration of Intention for Town Planning Scheme No. 1 (TPS No. 1) located within the Kalyan Growth Centre (KGC)
509 Minutes of Pre-Bid Meeting held on 13th April, 2017 for "Supplying/Providing cranes as required by Traffic Police Department for relief from traffic congestion on Western Express Highway for Metro Line 7 & 2A" Download(398.76 KB)Minutes of Pre-Bid Meeting held on 13th April, 2017 for "Supplying/Providing cranes as required by Traffic Police Department for relief from traffic congestion on Western Express Highway for Metro Line 7 & 2A"
510 Annual rate contract of xerox copies items for the year 2017-18 Download(50.98 KB)Annual rate contract of xerox copies items for the year 2017-18
511 Supplying cranes as required by Traffic Police Department for relief from traffic congestion on Western Express Highway for Metro Line 7 & 2A. Corrigendum No. 01 View Detail
512 Minutes of Pre-Bid Meeting held on 29-03-2017 for Appointment of a Consultant for Realizing the “Kalyan Growth Centre” by Preparing Town Planning Schemes for Phase-1 & Phase-2 Download(201.86 KB)Minutes of Pre-Bid Meeting held on 29-03-2017 for Appointment of a Consultant for Realizing the “Kalyan Growth Centre” by Preparing Town Planning Schemes for Phase-1 & Phase-2
513 Implementation of Station Area Improvement Schemes within the influence area of Monorail Stations along SGM Chowk – Wadala(Phase-II) corridor. Package I, Package II, Package III Download(63.52 KB)Implementation of Station Area Improvement Schemes within the influence area of Monorail Stations along SGM Chowk – Wadala(Phase-II) corridor. Package I, Package II, Package III
514 Supply of Protable cabin for ticket booking office and other structure near park for Metro Line-7 (Package-3) Download(93.59 KB)Supply of Protable cabin for ticket booking office and other structure near park for Metro Line-7 (Package-3)
515 Expression of interest providing of residential flats on lease basis in Mumbai Download(326.89 KB)Expression of interest providing of residential flats on lease basis in Mumbai
516 Pre qualification for Mumbai Trans Harbour Link Project. Addendum No . 02 (Tender No. 503) View Detail
517 Appointment of Consultant for feasibility study, preparation of Detailed Project Report and Project Management Consultancy for the work of “Widening and Construction of existing Akurli Subway on Western Express Highway.” Download(53.72 KB)Appointment of Consultant for feasibility study, preparation of Detailed Project Report and Project Management Consultancy for the work of “Widening and Construction of existing Akurli Subway on Western Express Highway.”
518 Providing/Supplying of road, signage’s boards required for safe traffic for relief from traffic congestion for Metro Project Line‐ 7 & 2A (Package-I & II). Corrigendum No. 03 View Detail
519 Implementation of Surya Regional Bulk Water Supply Scheme for Western Sub Region of Mumbai Metropolitan Region (MMR) on Design, Build, Maintain, Operate and Transfer (DBMOT) basis Download(109.55 KB)Implementation of Surya Regional Bulk Water Supply Scheme for Western Sub Region of Mumbai Metropolitan Region (MMR) on Design, Build, Maintain, Operate and Transfer (DBMOT) basis
520 1) Hiring of consultancy services for Feasibility study, Soil Investigations, Preparation of DPR, Detailed Estimate, Bid Documents and Tender Evaluation for the proposed road work from Subhash Chandra Bose Maidan, Bhayander (w) connecting to Dahisar(w) Ma Download(42.48 KB)1) Hiring of consultancy services for Feasibility study, Soil Investigations, Preparation of DPR, Detailed Estimate, Bid Documents and Tender Evaluation for the proposed road work from Subhash Chandra Bose Maidan, Bhayander (w) connecting to Dahisar(w) Ma
×

Rate Your Experience