Archive What's New/Events
| Sr. No. | Title | Published Date | Download/Details |
|---|---|---|---|
| 661 | MMRCL Recruitment 2015 (Phase-1) | Download(133.7 KB) |
|
| 662 | Implementation of Enterprise Web GIS Solution in MMRDA-Technical Presentation Notice | Download(349.17 KB) |
|
| 663 | "Planning, Detailed Design, Engineering and Bid process management for Elevated BRTS from Bandra to Dahisar” – Termination of Bidding process for Appointment of Consultants | Download(67.99 KB) |
|
| 664 | Pre-Bid Meeting Minutes of Preparation of the Comprehensive Redevlopment Actino Plan for Kalbadevi and Girgaon station on Mumbai Metro Line 3 Through Redevlopment of Existing Affected Buildings | Download(2.64 MB) |
|
| 665 | Construction of the Anik Panjarpole Link Road. - Desilting of Storm water Drains | Download(108.24 KB) |
|
| 666 | Mumbai Monorail : Dewatering arrangement for monsoon 2015 | Download(49.91 KB) |
|
| 667 | Notice for procuring services for Social Media related activities and creation and publication of creative at Mumbai Metro Rail Corporation Limited (MMRC) | Download(223.94 KB) |
|
| 668 | RFP for selection of agency for procuring Social Media related services at MMRC | Download(596.2 KB) |
|
| 669 | Resurfacing of Swaminarayan Flyover near Everard Nagar, Wadala | Download(75.32 KB) |
|
| 670 | CTS updation study- Clarifications to queries | Download(589.91 KB) |
|
| 671 | CTS updation study-Common set of deviation | Download(292.55 KB) |
|
| 672 | Repairing to offices allotted to RTO office in B-2 building in Phase-I at Truck Terminal Wadala | Download(43.11 KB) |
|
| 673 | Multi-Storied 250 Car Parking located at CR-2 Nariman Point Mumbai. Corrigendum No. 01 | View Detail | |
| 674 | Appointment of PMC for the work of construction of Khopoli Bypass with minor bridges | Download(447.71 KB) |
|
| 675 | Project Management Consultancy Services for the work of Widening and Improvement of Neral-Dasturi Road SH-109. Corrigendum No. 01 | View Detail | |
| 676 | NOC letter given to M/s WOW Entertainment and Media Pvt Ltd. | Download(685.77 KB) |
|
| 677 | Construction of Six lane Bridge across Ulhas Creek on proposed Motagaon-Mankoli Road on Contractor's own design and Lump sum basis in the State of Maharashtra under Extended MUIP. Corrigendum No. 05 | View Detail | |
| 678 | “Cleaning and Odour Control of Mithi River & Vakola Nalla and Installation of Additional Floating Boom at the confluence of Mithi River and Vakola Nalla in Bandra – Kurla Complex Area”. Corrigendum No. 01 (2nd Call) | View Detail | |
| 679 | "Cleaning and Odour control of Mithi River & Vakola Nalla and Installation of Additional Floating Boom at the confluence of Mithi River and Vakola Nalla in Bandra Kurla Complex Area." | Download(80.93 KB) |
|
| 680 | Operation and Maintenance of Urban Plaza having Food Court Restaurant with allied uses | Download(375.17 KB) |



